PROJECT SUCCESS / ENTERPRISE SAN MIGRATION

A Critical Migration. A Controlled Outcome.

The customer’s mission: modernize legacy SAN infrastructure while maintaining availability across two redundant fabrics.

PROJECT SUCCESS / ENTERPRISE SAN MIGRATION

A Critical Migration. A Controlled Outcome.

The customer’s mission: modernize legacy SAN infrastructure while maintaining availability across two redundant fabrics.

36 → 12Legacy switches to new directors
4,608Switch ports
662Array connections
2,582Host connections

Completed on Time • Zero Unplanned Downtime

36 → 12Legacy switches to new directors
4,608Switch ports
662Array connections
2,582Host connections

Completed on Time • Zero Unplanned Downtime

The Challenge

Replace 36 legacy SAN directors with 12 new directors, coordinate the connectivity and protect business continuity throughout the transition.

The infrastructure team needed a controlled sequence that preserved redundancy while introducing new capacity.

The Coordinated Approach

  1. Validate the architecture and connection requirements.
  2. Prepare tested, labeled and documented assemblies.
  3. Migrate Fabric A, followed by Fabric B, in separate maintenance windows.
  4. Decommission legacy cabling and racks after the migration.

The Challenge

Replace 36 legacy SAN directors with 12 new directors, coordinate the connectivity and protect business continuity throughout the transition.

The infrastructure team needed a controlled sequence that preserved redundancy while introducing new capacity.

The Coordinated Approach

  1. Validate the architecture and connection requirements.
  2. Prepare tested, labeled and documented assemblies.
  3. Migrate Fabric A, followed by Fabric B, in separate maintenance windows.
  4. Decommission legacy cabling and racks after the migration.

The Customer Delivered the Migration.

CABLEVENDOR helped engineer, supply and support the connectivity that made the deployment possible.

The Customer Delivered the Migration.

CABLEVENDOR helped engineer, supply and support the connectivity that made the deployment possible.

LET’S BUILD THE PLAN

Planning a Migration of Your Own?

Bring your architecture, equipment list and maintenance-window requirements.

LET’S BUILD THE PLAN

Planning a Migration of Your Own?

Bring your architecture, equipment list and maintenance-window requirements.