Polarity & Compatibility
Review the complete connection path and equipment requirements.
ENGINEERING SUPPORT
Validate compatibility, polarity and configurations before products are built.
ENGINEERING SUPPORT
Validate compatibility, polarity and configurations before products are built.
Validate polarity, compatibility, port maps and loss requirements with an engineering partner.
Review the complete connection path and equipment requirements.
Align reach, optical requirements and component selections.
Match architecture, strand counts and fan-out configurations.
Plan lengths, installation details and documentation.

Review the complete connection path and equipment requirements.
Align reach, optical requirements and component selections.
Match architecture, strand counts and fan-out configurations.
Plan lengths, installation details and documentation.

TECHNICAL RESOURCES
Plan your fiber link, build your project BOM and document the details with tools from your engineering partner.
FEATURED TOOL / WINDOWS DESKTOP SOFTWARE
Bring cable schedules, fiber paths, test evidence and client handover records into one practical project workspace.
Launch preview: Trial activation, customer downloads and subscription checkout are being connected. Visit CableLedger for the current availability and account requirements.
Already have an account? Sign in →
CUSTOMER ACCOUNT BENEFIT
Calculate fiber optic link loss, power budget and design margin. Compare Ethernet and Fibre Channel distance and insertion-loss references across OM3, OM4, OM5 and single-mode fiber.
LinkCalc is available to customers with a CableVendor account. Sign up for an account, then sign in to use the calculator and download the Windows copy.
Already signed in? The LinkCalc button opens your tool directly. Screenshot shows editable example values.
TURN REQUIREMENTS INTO A WORKING PLAN
Start with the tool that fits your next step. Your configuration and documentation should support the same project plan.
PLAN & COLLECT
Collect assemblies, part numbers, quantities and installation notes. Edit your lines and download one branded Excel spreadsheet.
Build a Bill of Materials →CONFIGURE & SPECIFY
Select fiber type, connectors, length, jacket and color. Generate a part number and add each assembly to your project BOM.
Configure Patch Cables →CONFIGURE & SPECIFY
Define backbone assemblies, larger fiber counts, connector types and fan-out requirements. Add multiple configurations to one BOM.
Configure Trunk Cables →CAPTURE & SHARE
Capture your equipment, architecture, schedule and project requirements. Download a branded PDF to share with your team.
Prepare My Project Brief →CUSTOMIZE & DOCUMENT
Define a custom assembly around your environment, including equipment models, labels and installation requirements.
Define a Custom Assembly →REFERENCE & PROJECT GUIDANCE
Find practical guidance, learn from a completed migration and keep the essential specification details close at hand.
Explore CABLEVENDOR articles and insights to support your cabling and infrastructure decisions.
Read Technical Articles →See how a large SAN migration was planned and delivered across two controlled maintenance windows.
Explore the SAN Migration →Organize your requirements, drawings and BOM so our team can help confirm your next step.
Plan Your Project →The same code applies to Connector A and Connector B. These are the defined part-number codes; available options are shown in each configurator.
| Connector Type | Code | APC Code |
|---|---|---|
| LC Reversible Uniboot | B | — |
| MDC | D | — |
| SN | N | — |
| MTP®-8 | Y | F |
| MTP®-12 | M | E |
| MTP®-16 | A | G |
| MTP®-24 | C | H |
| MMC-12 | K | V |
| MMC-16 | Q | W |
| MMC-24 | U | X |
Example: J002-BB003PF-AQM4 identifies a 2-fiber, LC reversible uniboot-to-LC reversible uniboot, 3-foot, OFNP, Aqua OM4 assembly. Polarity and pin requirements are captured separately.
Include your BOM, Project Brief and available drawings when submitting your project for review.
MTP® is a registered trademark of US Conec Ltd.
LET’S BUILD THE PLAN
Tell us what you are connecting and when it needs to be operational.
LET’S BUILD THE PLAN
Tell us what you are connecting and when it needs to be operational.